TNAG-2142-FCO40-3061-Hong-Kong-Port-and-Airport-Development-Strategy-(PADS)-1990 — Page 79

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

2

impact of wide-bodied jets on potențial

potential capacity of Kai

Tak. Kai Tak Terminal Building was then the limiting

factor. This resulted in the Stage

the Stage V Terminal expansion

plans. In 1983 plans to proceed with CLK were temporarily

shelved because of the world-wide economic recession.

5.

Stage V Terminal Expansion

At a cost of $270m, this project

1984 to 89 (Feb.).

increased

terminal

capacity from 3,400 pax per hour to 5,300 pax per hour.

6.

Fourth Consultancy in 1987 (Oct. 1987

-

Nov 1988

by RMP Encon

-

traffic growth

alerted authorities to new

"Kai Tak Consultancy")

figures since early 1980's

problems. This study confirmed Kai Tak would reach

capacity in 1993 unless improvements were made to extend

its life through to 1996. Runway and apron capacity had

become the main limiting factors.

7.

Fifth Consultancy 1988

-

May 1988

Master Plan.

(CLK Master Plan Review

-

this reviewed the CLK

Oct 1988, RMP Encon)

New traffic forecasts were made and a

planning horizon of 2010 adopted. This enabled comparisons

to be made with the site in the Western Harbour also being

studied.