4.
Western Harbour
Crossing
feasibility study
Consultant
November 1989
appointed
Acer
Consultants
(Far East) Ltd.
Maunsell
Consultants
Asia Ltd.
Parsons Brinckerhoff
(Asia) Ltd. Pypun-Howard Humphreys Ltd. The MVA Consultancy
Highways Department
(Mr J.M. Turner 573 3885)
5.
Route 16
feasibility study
June 1991 (May be advanced to September 90)
Highways Department
(Mr H.S. Kwong
733 2508)
September 1990
6.
Green Island Link
preliminary feasibility study
7.
Central Kowloon Route
September 1990
feasibility study
Highways Department
(Mr J.M. Turner 573 3885)
(Environmental Protection Department EA/EIA Studies
J
(Mr G.D.E. Sanvicens 835 1102))
Highways Department
(Mr J.M. Turner 573 3885)
Environmental Protection
Department
Studies
EA/EIA
(Mr G.D.E. Sanvicens
No comments yet.
Private notes are available after approval.