TNAG-2109-FCO40-3008-Outer-Space-Act-1986-extension-to-Hong-Kong-1990 — Page 96

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

2.

1.6

Others

and

1.6.1 Three positions for the Client's personnel shall

provided in the Commanding Hall of the Command Control Centre during the final countdown.

be

1.6.2

Assistance to the Client and his contractors to arrange tours within the territory of China.

1.6.3

Xichang

regular

Assistance in arranging flights between Airport and another Chinese Airport which has flights to Hong Kong, such as Kunming and Chengdu. The price is cost to the Client.

1.6.4 After the Launch the following services shall be provided:

Preliminary payload injection data shall be provided as soon as possible after separation.

A Payload Injection Data Report shall be provided within 30 minutes of separation.

A Launch Mission Evaluation Report shall be provided within 3 months of launch.

In the Mission

launch.

event of an abnormal flight, Quick Look Data shall be provided within one week of Assistance shall be provided to the Client in interpreting the Quick Look Mission Data and any additional data that may be required to determine the Launch Vehicle performance and the flight environment of the Client's Spacecraft.

OPTIONAL SERVICE ITEMS

2.1 Optional Service Items Ordered by the Client

2.1.1 Launch Vehicle

2.1.1.1 Support to the first Spacecraft interface test, consisting of a fit check and separation test with a test adapter, at the Spacecraft manufacturer's facility. Date of test is TBD.

Price: USD 12,000.00

ANNEX II

5

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.