Exhibit C

Subsystem

ACS (cont)

Generic Test #

132

132

132

132

115

Test

Pointing/BIAS

Mode Switching

Moon Discrimination

Earth Sensor Preamplifier Output Beacon Mode

Acquisition Pointing/BIAS

Mode Switching

Relative Rate Mode

Relative Rate Toggle

Pseudo Earth Mode

Torque/Pointing Calibrations

Motor Voltage

Torque Calibrations. Pointing Calibration

BAPTA Friction Torque MIP Verification

Stall Torque

Track system integration verification

Battery Controller Power Functional

Bus Overvoltage

Bus Undervoltage

Solar panel functional

Solar Panel Pulsed Xenon Test

Battery Heater Controller

Spacecraft Fuses

122

122

123

137

Power

300

315

320

305

Bus Limiter Operation

335

TBS

330

355

Propulsion

TBS

Valve Electrical

TBS

TBS

TBS

TBS

TBS

TBS

Mechanisms

405

TBS

410

Heater

Visual Examination

Valve Functional

Thruster Valve Leakage

Propulsion Monitoring

Fill and Drain Valve Leak Check

Antenna Positioner Mechanism

Deployment Verification

Omni Deployment

Solar Drum Positioner

Structure

4.

Systems Tests

Deployment Verification

TBS

Grounding Checks, Conductivities

·

The Spacecraft will undergo system level tests following arrival at the launch site. The tests to be performed make up the Launch Site Systems Performance Tests (LSSPT) that

done prior to each HS 376 launch. The tests are as follows.

are

C-4

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.