CONFIDENTIAL
9
-
landfill), a second at Ping Yeung (the North East New
Territories or NENT landfill) and the third south of the
existing Junk Bay landfill (the South East New Territories
The landfills will be designed and
minimise their environmental impact not only
during their operating life
operating life but also after closure.
or SENT
landfill).
operated to
2.14
years.
These landfills have a potential life of 15 to 25
will
taken there by barge or
Wastes
containerised road
(RTS) built close
intended that the
be
vehicle, from refuse transfer stations
to major centres of population.
It is
RTS's and the landfill sites will be
constructed and operated by the private sector.
waste strategy described above is illustrated in Figure
designed,
The
2.
2.15
environmental
The first contract for an RTS was signed in late
1988 (Kowloon Bay). The RTS will be built to the highest
standards and will take wastes from the
Kowloon area. A study is currently being conducted on the
design and construction of an RTS in Chai Wan. When
resources
undertaken
are
made
with
Stations in Hong
Shatin.
available
further
studies will be
a view to providing Refuse Transfer
Kong West, at Yuen Long/Tuen Mun and at
Studies are being carried out on the WENT and NENT
landfills, and a study on SENT is expected to start in late
Target
1989/90.
facilities are
-:
dates
for the commissioning of new
CONFIDENTIAL
No comments yet.
Private notes are available after approval.