- 3 -
hereby appropriated or permit any further burials to take
place.
7. Where any cutting away removal or setting back of
adjoining adjacent or nearby hillside or banks or any building
up or filling in is required for the purpose of or in
connection with the formation levelling and development of the
said piece or parcel of ground or any part thereof the Commission!
shall construct or contribute towards the cost of the
construction of such retaining walls or other support as shall
be or shall at any time become necessary to protect and support! such hillside and banks and the said piece or parcel of ground itself and to obviate and prevent any falling away landslips
or subsidence occurring thereafter and shall at all times
maintain the said retaining walls or other support in good and substantial repair and condition and in the event of any landslip subsidence or falling away occurring at any time
whether in or from adjoining hillside or banks or in or from
the said piece or parcel of ground itself as a result of any default by the Commission under this Clause the Commission
shall at its own expense reinstate and make good the same
and shall indemnify the Government from and against all costs
charges damages demands and claims whatsoever which shall or
may be made suffered or incurred through or by reason thereof and shall if required by the said Director so to do by notice
in writing carry out such construction and or maintenance or
reinstate and make good any falling away landslip or subsidence and if the Commission shall neglect or fail to comply with
such notice within the period specified therein the said Director may forthwith execute and carry out the same and the Commission shall on demand repay to the Government the cost
thereof.
8.
The construction and maintenance of the cemetery will be
the responsibility of the Commission and it has been agreed that the costs and expenses thereof shall be shared by the
No comments yet.
Private notes are available after approval.