TNAG-1958-FCO40-2787-Future-of-Hong-Kong-Daya-Bay-nuclear-power-plant-1989 — Page 135

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

RESTRICTED

2

167237

MDHIAN 8626

RESTRICTED

FM BTC HONG KONG

TO IMMEDIATE DTI

TELNO INDUS 004

OF 160835Z JANUARY 89

INFO ROUTINE PEKING

FOR GOODMAN EM4 FROM DAY.

PEKING FOR AMBASSADOR

HKC166/1

16 JAN YORD

oMs

DAYA BAY GNPJVC/GEC COORDINATION MTG.

TOP COPY DIST ?

1 NEXT COORDINATION MTG IS AT CLAMART, PARIS ON THURSDAY 23 MARCH

1989 AT 1100 HRS. IT IS HOPED TO ARRANGE VISIT TO FRAMATOME ON 24 MARCH.

2.

MEETING RAN SMOOTHLY ON 12 JANUARY, WITH ONLY ONE MAJOR PROBLEM

THIS CONCERNS THE STRUCTURAL STEELWORK. I THINK WE NEED TO

INTERVEN. IT CONTINUES TO BE DELAYED.

AREA.

3.

CAN YOU CONTACT MR BLOWER MD OF CLEVELAND BRIDGE (C.B.) ALONG

THE LINES - HMG REPRESENTATIVE AT DAY BAY COORDINATION MTG WAS

DISMAYED TO SEE THE PROBLEMS C.B. WERE CAUSING ON THE STEEL ERECTION

PROGRAMME. THIS IS CREATING A BAD IMAGE FOR UK INDUSTRY IN A

POLITICALLY SENSITIVE AREA. GNPJVC HAVE REQUESTED FROM GEC FULL

DETAILS OF ALL ITEMS OF THE STEELWORK.

A.

B.

C.

A FULL LIST OF ALL COMPONENTS.

I.E.

FULL INDICATION OF LOCATION OF COMPONENTS IE AT SITE, IN SHIPMENT OR OUTSTANDING.

DETAILS OF PROGRAMME FOR OUTSTANDING ARTICLES AND MODE OF

TRANSPORT IE AIR FREIGHT ETC.

CAN C.B. PLEASE ENSURE THAT GEC OBTAIN THE NECESSARY INFORMATION ASAP.

4.

IT WOULD APPEAR THAT DESPITE HAVING GEC PERSONNEL AT SITE AT

C.B., CB ARE TREATING THE CASE AS LESS THAN URGENT. GEC ARE NOT ABLE TO ASCERTAIN WHAT IS WHERE AND WHAT IS MISSING. THE BASIC

PROBLEM IS THAT C.B. IS BUSY WITH MUCH UK WORK AT GOOD MARGINS AND

LITTLE HASSLE AND BLOWER WISHES TO MAXIMISE SHORT TERM PROFITS.

1

PAGE

RESTRICTED

Page 135Page 136

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.