13
7.6 This rapid construction programme is indicated by the enclosed bar chart in Figure 1, with Packages 1, 3 and 4
commencing in 1991, and Package 2 in 1997. On the basis of
this programme, the diagram in Figure 2 shows successive stages of development at 1993, 1994 and 1999.
&.
Cost of Development
8.1 (a) For the development shown on the preferred OGP, a
preliminary estimate has been prepared for the costs of reclamation and infrastructure (mid 1988 prices) as
follows : -
8.2
$ billion
Reclamation and Servicing
3-8
Major Roads
4.5
(Trunk Road and Connections)
NIR Link
5.5
14.0
lotal
13.0
(b) An assessment has yet to be made of the costs of land
acquisition. It is not anticipated that there will be
substantial land acquisition for the reclamation works,
but construction of the trunk
road
connections will
involve the resumption of private buildings.
The total ret.Tamation area is approximately 100 ha and the
unit cost of formed and serviced land is therefore about
link and 48 100 per
$13 660 per me including FIR
excluding Fik link, both
acquisition.
Ligures
excluding Land
5. Attachments
Figure 1 Bar Chart Programake
Figure 2 - Staging of Reclamation
Ligure 3
Recommended ODP