Concrete bases for the

tented area

Hot water for showering

purposes

I

2 -

Original Requirements

Additional Requirements

Total

Cost

$'m

10.00

10.00

4.75

4.75

0.80

0.80

0.40

0.40

0.20

0.20

6.00

6.00

4.60

4.60

1.50

1.50

Total

HKD14.75 PDS 1.229

EKD13.50

HKD28.25

PDS 1.125

PDS 2.354

Amount committed to UK donation : PDS1.23

HKD14.76

Note: In our Telno. 2923 we requested PDS1.0 million for additional works at Sek Kong. We have now revised thik estimate to PDS1.25 million to cover the costs providing a hot water shower system.