TNAG-1911-FCO40-2715-Financial-assistance-from-the-UK-Government-to-Vietnamese-re-1989 — Page 58

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

EMERGENCY ACCOMMODATION

CONFIDENTIAL

ANNEX A

1. The Hong Kong Government have asked us to pay the costs (up to

£5.6 million) of improvements to emergency accommodation because it

has proved necessary:

(i) to erect much more substantial perimeter fences around the

camps to prevent the inmates from escaping.

(ii) to build the camp at High Island on a more permanent basis than

originally envisaged because of the continued high level of

arrivals.

(iii) to ensure that the camps can withstand severe weather

conditions eg by building raised concrete bases for the tents

at Sek Kong.

(iv) to use ferries for a longer period than was originally

anticipated, thus raising the hire costs; and

(v)

to build a reception centre at Tai A Chau in order to provide 1200 additional places for new arrivals (a doubling of existing

reception centre capacity).

2. The total required for completion of these various projects is

based on the following estimate:

High Island

HK$

36.00 million

Sek Kong

HK$

13.50 million

Ferries

HK$

7.20 million

Tai A Chau improvement

works

HK$

9.88 million

HK$

66.58 say 67 million

TOTAL IN POUNDS

£

5.6 million

A detailed breakdown of individual items of expenditure is attached.

The

Work on some of these projects has already begun, drawing on

funds set aside for stages 3 and 4 of the Whitehead project.