3
completion of Route 5 from Sha Tin to Tsuen Wan and the
widening of Tai Po Road to three lanes by the end of 1989 will
relieve substantially traffic congestion in the corridor.
pa cent
It
is estimated that about 10 of vehicles in the corridor will
use Route 5 for trips to Tsuen Wan and Kwai Chung. The
additional lane on Tai Po Road will provide an extra capacity
for 1,500 vehicles per hour and should significantly improve
southbound traffic. Finally, the completion of road T6 across
the Shing Mun River linking Tolo Highway with Ma On Shan Road
in 1990 will provide a shorter route before the opening of
Tate's Cairn Tunnel from Tolo Highway to Kowloon via the Ma On
Shan Nai Chung link road which I mentioned earlier.
بھر
Apart from these highway projects costing over
$3 billion, a consultancy study is being carried out to
G consider short term traffic management measures. The first
part of the study has been completed and established the
effectiveness of the tidal flow scheme and the use of traffic
signals to improve traffic flow through the Lion Rock Tunnel.
These have been implemented on weekdays since mid-January and
bu cent have resulted in an 11 increase in tunnel capacity in the
morning peak hours. The second and final part of the study
including other improvement measures will be completed in
April.