TNAG-1658-FCO40-2306-Daya-Bay-nuclear-power-station-project-safety-concerns-in-Ho-1987 — Page 208

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

CONFIDENTIAL

FM HONG KONG

TO IMMEDIATE FCO

CONFIDENTIAL

HKC 166/3

RECEIVED IN REGISTRY

1 2 OCT 1987

004115

MDHIAN 0240

113

TELNO 3824

DESK OFFICER

OF 090755Z OCTOBER 87

INDEX

PA

REGISTRY

Action Taken

INFO PRIORITY PEKING

710

TOP COPY Q DIST?

OUR TELNO 3726: DAYA BAY NUCLEAR POWER STATION

1. THE LATEST DEVELOPMENTS ARE AS FOLLOWS:

2. THE EXECUTIVE COMMITTEE OF THE GNPJVC MET ON 7 OCTOBER TO

CONSIDER A PROPOSED TECHNICAL SOLUTION, DEVELOPED BY THE EDF DESIGN TEAM, TO REMEDY THE DEFICIENCY CAUSED BY THE INADVERTENT OMISSION OF REINFORCING BARS FROM THE RECENTLY POURED FIRST FOUNDATION LAYER.

WE UNDERSTAND FROM SIR JACK CATER THAT THE MEETING WAS LONG AND

DIFFICULT. THERE WAS CLEARLY SOME UNHAPPINESS ON THE PART OF THE

CHINESE OVER OUR EARLIER INTERVENTION. NEVERTHELESS THIS APPEARED

HAVE HAD THE DESIRED EFFECT AS IT WAS AGREED THAT A PRESS STATEMENT SHOULD BE MADE. THE NEWS WAS CARRIED IN TODAY'S ''SHENZHEN

SPECIAL ZONE DAILY'', A TRANSLATION OF WHICH IS IN MIFT.

ΤΟ

3. EDF'S PROPOSED SOLUTION IS TO FURTHER STRENGTHEN THE NEXT LAYER

OF THE FOUNDATION BY INCORPORATING MORE REINFORCING BARS WHICH, WHILE RESULTING IN A SIGNIFICANT INCREASE IN THE AMOUNT OF STEEL

IN THE FOUNDATION, WILL ENSURE THAT THE INTEGRITY AND STRENGTH OF

THE REACTOR BUILDING DO NOT DEVIATE FROM THE ORIGINAL DESIGN

REQUIREMENTS. WE UNDERSTAND THAT THE GNPJVC ARE STILL CONSIDERING

THE PROPOSED SOLUTION AND ARE LIKELY TO ADOPT IT PROVIDED THE NNSA

INDICATE THAT THEY HAVE NO OBJECTIONS.

4. FOR OUR PART PLANNED ARRANGEMENTS SET OUT IN PARA. 3 OF OUR

TELNO 3711 ARE NOW BEING IMPLEMENTED. SIR JACK CATER YESTERDAY

BRIEFED MR WONG PO-YAN, CONVENOR OF THE LEGCO AD HOC GROUP

ON THE PROBLEM. EARLY THIS MORNING, SIR JACK ALSO MET WITH THE SECRETARY FOR ECONOMIC SERVICES AND OTHER GOVERNMENT OFFICIALS TO

GO OVER POSSIBLE QUESTIONS AND ANSWERS THAT HE MAY FACE WHEN HE

MEETS WITH THE PRESS TODAY. HE SUBSEQUENTLY BRIEFED THE FULL AD

HOC GROUP (ASSISTED BY TECHNICALLY QUALIFIED STAFF FROM THE JOINT

VENTURE COMPANY) AND THE PRESS DURING THE LEGCO AD HOC GROUP'S MEETING WITH THE MEDIA AFTER THEIR MEETING.

5.

WE HAVE PREPARED A PRESS STATEMENT WHICH WE PLAN TO ISSUE