TNAG-1658-FCO40-2306-Daya-Bay-nuclear-power-station-project-safety-concerns-in-Ho-1987 — Page 107

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

FOR PRU USE ONLY

Serial no:585

PARLIAMENTARY QUESTION

For WRITTEN ANSWER on

30/10/87

Head of HKD

Please submit

a draft Answer & Background

741

to Parliamentary Unit

before

29/10/87

NOON

Party

La

TEXT OF QUESTION :-

COHEN, HARRY (heyton)

To ask the Secretary of State/HMG:

if he will make a statement about the construction errors on the nuclear power station being built at Daya Bay, 30 miles from the city

centre in Hong Kong.

to P/S

LORD GLENARTHUR

(Minister)

for answer by,

MR. EGGAK

(Minister)

нис 166

RECEIVED IN REGISTRY

- 5 NOV 1987

Z

DESK OFFICER

INDEX

REGISTRY

PA

Action Taken

for approval by

ANSWER

10 NOON

am

30 atbe

PQS

...REPLY(S)

copy to

Private Secretary

MR. EGGAN

PS/

(Minister)

Parliamentary

Clerk

Construction work on the second layer of the Unit 1

reactor raft of the Daya Bay plant was suspended

in mid-September following the discovery that a

number of reinforcement bars for the first and lowest

of the five concrete layers (316 out of a planned

total of over 14,500) had inadvertently been

omitted. The Joint Venture Company responsible for

the project are considering remedial action to

ensure that the finished construction will still

comply with all the safety requirements of the

original design. We are satisfied that all the parties

involved attach the utmost importance to

considerations of safety, and to the need to make

certain that these are not compromised.

authorised

Cobden

(Head of Dept)

Comments