In 1986 there were 1,176 factories in the SSEZ,
workforce of 130,000. The industrial output value was
KMB 3.5 bn. This is expected to reach RMB 5 br in
1987. The major industries are electronics, textiles,
building materials, machinery, pharmaceuticals and food
processing.
In the "Seventh Five-Year Plan", the aim is to improve
the product mix and the flexibility of industry, and to
move to more sophisticated production. The industrial
output value of the SSEZ is projected to reach KMB 8 bn
by 1990, 60% of which is expected to be exported.
At the end of 1986 the electricity generation capacity. installed in Guangdong was 4,650 megawatts (MW), 2,050 MW being thermal power and 2,600 MW being hydro-power.
An addition of 3,000 MW is expected by 1990, due to the
completion of the Shajiao Plant A (1,200 MW) and Plant B
(700 MW), and the expansion of the Huangpu Power Plant
(600 MW) and hydro-power (500 Mk).
In the 1990s there would be additional sources of energy
supply, from natural gas, pump storage, and the Daya Bay
Nuclear Plant. The possibility of using oil shale for
generating electricity would also be stucied.
Strategic Planning
6.2.1 Guangdong is implementing the national policy of controlling the size of large cities, and promoting the
industrial development of smaller cities and towns. The
agricultural work force is likely to decline and the
industrial work force is likely to spread out fairly
uniformly. This implies that the population will be
well distributed awong ર large number of urban
development centres.