(A)
General Description of the Works
This scheme forms part of the New Territories
· Circular Road Improvements project, Au Tau to Fan Kam
Road, and involves the construction of approximately 750
metres of the trunk road and associated works between the
section from Sheung San Wai and Yau Mei San Tsuen. A
layout of the road is shown on Plan No. NH 6153A.
The new road will be built to trunk road
standards with no frontage access and will initially have
dual 2-lane carriageways. Allowance has been made in the
project for widening to dual 3-lane carriageways in future
as and when necessary without any additional resumption of
land.
•
There will be a service road on both sides of the
trunk road. Where possible, the existing Castle Peak Road
will be utilized as one of the service roads. An
interchange, to link the service roads to the trunk road,
will be located just outside the southern limit of this
scheme at Fairview Park. It will also allow traffic to
move from one service road to the other without affecting
the flow on the trunk road. Major vehicle and pedestrian
accesses leading to the nearby villages will be connected
to the service roads.