ROADS (WORKS, USE AND COMPENSATION) ORDINANCE
EASTERN HARBOUR CROSSING
Serial No.
2
***
Objector
& Date
Summary of Objection
Action Taken
&
HO Comments
Mr. D.I. McIntosh, Chief Estate Manager, Taikoo Shing (Management) Limited
24.1.86
(i) Siting of a proposed footbridge close to Pine Mansion will result in a loss of privacy.
(ii) Construction operations, concrete mixing or
batching plant in works areas close to Taikoo Shing may cause disturbance.
(iii) Access ramps to the tunnel should be moved
further away from Taikoo Shing.
(iv) Access ramps to the tunnel should be screened by landscaping to minimise noise and air pollution.
Letter written 18.2.86 explaining the following aspects of the scheme:
i) There are no plans to construct a footbridge
as part of this scheme; this is not considered to be a valid objection.
(ii) Disturbance due to construction activity is
inevitable. The main concrete batching plant will be in Cha Kwo Ling Quarry.
(iii) Due to physical constraints and design/safety
standards, the access ramps cannot be relocated further away from Taikoo Shing.
(iv) Landscaping will be provided, to screen the
access ramps, which, along with the noise- reducing measures to be incorporated in the project, will satisfy the Environment Chapter of the Hong Kong Planning Standards and Guidelines.
It is recommended that the objections be overruled although it is considered that items (i) and (iv) have been substantially met.