TNAG-1515-FCO40-2076-Bridges-and-tunnels-in-Hong-Kong-1986 — Page 49

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

epair of immersed tube and

road works.

37. (1) The Road Company shall keep in a state of

repair until the expiration or revocation of the franchise

granted by section 4(1) and to the satisfaction of the

Director

-

(a) the fabric of the immersed tube including all

sealing elements and the common wall separating

the road conduits from the railway conduits and

the rock armouring; and

(b)

all works, whether within or outside the immersed

tube, which it has the right to keep in place

under section 4(1)(c).

(2) The Director may, by notice in writing, require

the Road Company to effect such repairs and alterations to

the structures or works it is required by subsection (1) to

keep in a state of repair as he considers necessary for the

proper repair thereof and for the obviation of fire and

other hazards therein.

(3) If the Road Company fails to comply with any such

requirement within a reasonable time after the receipt of

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.