Scheme annexed to Plan To. 80111/30/02 deccribing the construction of a covered footbridge
cressing Gloucester Road at Stewart cad
General Description of the Works
The proposed works involve the construction of a covered
footbridge crossing Cloucester hoai at Stewart load, as shown on
Flan No. 90111/30/02 (the Plan'). The Setwart Road Footbridge
will provide en additional rorth-south access to the Wan Chai
Reclamation across Cloucester Road. At the northern end of the
footbridge a direct link will be made to the existing Causeway
Centre podium, and a stair will provide access to the ground
level. At the southern end an escalator and stair will be
provided in Stewart Road.
Re-alignment of Stewart Road between
Jaffe Foad and Cloucester Road will be required to provide space
for the escalator and stair.
Roads to be Modified
For the purpose of and/or incidental to the said works
it will be necessary to carry out the road modifications as listed
hereunder :-
(i) The existing road width of Stewart Road between
(ii)
Jaffe Road and Cloucester Road will be reduced
to 11.00 metres by realigning the westside kerbline,
as shown on the Plan.
The existing kerbline on the southride of the eastbound-
Gloucester Road carriageway will be slightly modified,
as shown on the Plan.