TNAG-1506-FCO40-2064-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 53

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

Appendix A

Sunday, August 3

9.00 hrs

11.00 hrs

Monday, August 4

8.15 hrs

9.00 hrs

9.15 hrs

9.35 hrs

Programme of Visit in France

Arrive at the Paris-Orly Airport (with the exception of Mr H. CHOENG-LEEN)

Welcome at the airport by Mr Crochon, Engineering and Construction Division Daya Bay Project, EDF

Transfer to the SOFITEL Hotel near the Charles de Gaulle Airport

Mr H CHEONG-LEEN arrives at the Charles de Gaulle Airport to be welcomed by Mr Crochon

Lunch at "Le Jardin" Restaurant of the SOFITEL Hotel

Depart for Dunkerque (by coach) accompanied by Mr Crochon

Dinner and Night at the MERCURE Hotel in Dunkerque

Departure of the coach from the MERCURE Hotel (five places in the coach will be available for the journalists)

Arrive Gravelines Nuclear Power Plant (The five journalists are authorized to assist at the general presentation of the Gravelines site)

Welcome by Mr Caillault, Director for International projects, Engineering and Construction Division, EDF

Projection of a film (in English) entitled "Nuclear Pressurized Water Reactor"

Presentation of the integration of the Gravelines Plant in the region and the operation orgainization (with audio-visual supports) by Mr Pruvot, Manager, Gravelines sites

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.