TNAG-1506-FCO40-2064-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 153

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

FIGURE 2

Locations of High Pressure Injection System

* indicates that the component

lies at low level ip the buildings

Control building

Control building annex North

Control building annex South

Auxiliary building North

Pumps

ECCS supply line

RW

ST

Auxiliary building South

To PC cold legs

Steam &

Reactor building

feed cell

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.