FIGURE 2
Locations of High Pressure Injection System
* indicates that the component
lies at low level ip the buildings
Control building
Control building annex North
Control building annex South
Auxiliary building North
Pumps
ECCS supply line
RW
ST
Auxiliary building South
To PC cold legs
Steam &
Reactor building
feed cell
No comments yet.
Private notes are available after approval.