TNAG-1505-FCO40-2063-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 213

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

CODE 18-77

F

ныс..166/1

RECEIVEDI.

, * སྱཱ

30 SEP 1986

Reference.

MNS 160/7

6218

From: P Newall

NED

Date: 18 September 1986 cc Mr B Freeman

D/Energy

•. Rel

пр

FED

2. раниковые в

-M

Mr Barton

HKD

EC

-

CHINA

VISIT TO UK BY CHINESE OFFICIALS

1. Department of Energy are coordinating the arrangements which at present include visits to :

a)

b)

c)

Nuclear Installations Inspectorate (13 October). CEGB (13 October).

Safety and Reliability Directorate, UKAEA at

Warrington (14 October).

D/Energy will let us have a detailed programme when available.

2.

The visitors, all from the National Nuclear Safety Administration (also apparently known as the Nuclear Safety Bureau), are as follows:

i.

ii.

iii.

iv.

V.

Mr Shi GUANGCHANG, Dy DG

Mr Li CHENGGE, Ch. Eng.

Mr Li ZHIYU, Dir of Dept of Research

Mr Zhao YIMIN, Dy Dir of Dept of Research To be nominated.

The EC contact is Mr C Jones, who is making all travel arrangements.

18 September 1986

kwally

P Newall

Nuclear Energy Department

233 5543

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.