SEP 23 '86 15:42 TIBCOOU) HK GOVT
operational details have yet to be worked out;
(ii) We were assured of the HKNIC's management parti-
cipation at all levels throughout the life-span
of the plant;
(iii) There are clear delineation in the sphere of
responsibilities between the Government ministries
and agencies for management and regulatory control
of nuclear power plants, The National Nuclear
Safety Administration operates as an independent
regulatory body, with the necessary authority
prescribed through legislation. It aims at ensuring
the safe and quality construction and operation of
nuclear power plants strictly in accordance with
the laid-down safety regulations;
(iv) Details of a comprehensive and well
coordinated
emergency plan will be drawn up in the next 2 to 3
years in accordance with the IARA standards and the
specific needs of the areas in the vicinity of the
plant;
(v) As far as the design and construction of the plant
are concerned, we have been assured that the site
of the Daya Bay plant is not linked to any under-
ground water source. We have also been told that
a hydrogen-recombiner system and a system achieving
the same objective of the pressurized containment
penetration design used in the Zion plant in USA
have been incorporated in the Daya Bay plant. We
have also been assured that any future system that
/will