TNAG-1505-FCO40-2063-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 166

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

SEP 23 '86 15:43 TIBCOOU) HK GOVT

4

will provide greater safety for the Daya Bay plant

will be seriously looked into for the purpose of

incorporation.

As for the sand filter system,

the French have yet to submit detailed data to

the Joint Venture Company for a final decision

to be made. Nevertheless, the Chinese authorities

stressed that finance for this item has already been

budgetted for and that the final decision will be

based solely on engineering grounds,

(vi) It has been indicated to us that arrangements could

be made between Guangdong and Hong Kong on the

exchange of information and coordination of

contingency plaming, It was also noted that

cross-border arrangements had been made between

the Guangdong environmental protection authorities

and the Hong Kong Royal Observatory for the

monitoring of radiation in relation to the Daya

Bay plant. Also, decisions have been made to set

up a monitoring network in the vicinity of the

plant.

(vii) At our request for an assurance that the future

level of electricity charges to the Hong Kong

consumers should not be higher than the tariff

charged by the liong Kong coal-generated power,

the Chinese authorities confirmed that China had

already fully taken into account the interest of

Hong Kong people and entered into a guaranteed

price agreement for the Hong Kong consumers for

/the