FM FCO

TO DESKBY 290100Z HONG KONG

TELNO 1604

OF 281645Z JULY 86

INFO IMMEDIATE PEKING, PARIS

2435:

YOUR TELNO 2435:

ARTICLES

вы

DAYA BAY: OBSERVER AND HONG KONG STANDARD

3630

52955

4

WE HAVE COPIED THE HONG KONG STANDARD ARTICLE AS

REQUESTED IN TUR.

1.

2.

(A)

(B)

3.

DTI HAS PREPARED THE FOLLOWING DEFENSIVE PRESSLINE: (IF ASKED WHETHER THE CHINESE ONLY ORDERED GEC TURBINES PROVIDED HONG KONG GUARANTEED TO TAKE A LARGE PROPORTION

OF THE ELECTRICITY GENERATED AT DAYA BAY) NO. ALTHOUGH

MINISTERS WERE ANXIOUS TO SEE THE TURBINE ORDER WON BY

UK, THERE WAS NO CONTRACTUAL AGREEMENT TO THIS EFFECT. IN ANY CASE, THE AGREEMENT ON THE SUPPLY OF ELECTRICITY FROM DAYA BAY TO HONG KONG WAS CONCLUDED IN THE SUMMER OF 1984, WELL BEFORE THE COMMERCIAL NEGOTIATIONS ON THE

TURBINES BEGAN.

(IF ASKED WHETHER ANY REDUCTIONS IN GEC'S PRICE WOULD

LEAD TO A LOWERING OF QUALITY)

NO.

GEC HAVE ASSURED US

THAT THE COMMERCIAL NEGOTIATIONS HAVE NOT LED TO ANY

REDUCTIONS IN THE QUALITY OF THEIR EQUIPMENT.

FCO NEWS DEPARTMENT HAS NOT/NOT BEEN ASKED ABOUT THESE ARTICLES

nowe

GUANGDONG

LIMITED

HKD

FED

NED

TRED

PUSD(MR CROWLEY) WED

[COPIES SENT TO NO 10 DOWNING STREET]

ADDITIONAL DISTRIBUTION

P8

PS/MR RENTON

PS/PUS

SIR W HARDING

MR DAUNT

MR WILSON MR SLATER

GUANGDONG NUCLEAR