FM HONG KONG

TO IMMEDIATE FCO

TELNO 2442

OF 290345Z JULY 86

INFO IMMEDIATE PEKING, DEPARTMENT OF INDUSTRY, BTC HONG KONG

INFO IMMEDIATE PARIS

350

PEKING TELNO 1352 TO FCO CHINA: NUCLEAR SAFETY

IT DOES NOT SEEM TO US THAT THE DIFFICULTIES DESCRIBED IN TUR OF SUGGESTING TO THE CHINESE (AND THE FRENCH AND GEC) THAT A TEMPORARY DELAY OF TWO OR THREE WEEKS OR SO OUTWEIGH THE POTENTIALLY SERIOUS POLITICAL CONSEQUENCES OF A SEPTEMBER SIGNING FOR HONG KONG. OUR OBJECTIVE IS TO CARRY THE PEOPLE OF HONG KONG WITH US. AT THIS POINT IN TIME WE FEEL THAT EFFORTS IN THIS DIRECTION SHOULD TAKE PRIORITY. IN SHORT, THE LONG TERM ADVANTAGES OF BEING HELPFUL TO UMELCO OUTWEIGH THE DIFFICULTIES ASSOCIATED WITH INDICATING TO THE CHINESE, FRENCH AND GEC THAT A SHORT DEFERMENTS IN EVERYBODY'S

INTERESTS.

AKERS-JONES

YYYY

HMLNAN 9690

GUANGDONG

[COPIES SENT TO NO 10 DOWNING STREET]

LIMITED

HKD

FED

NED

TRED

PUSD(MR CROWLEY) WED

PS

PS/MR RENTON PS/PUS

SIR W HARDING

MR DAUNT

MR WILSON MR SLATER

ADDITIONAL DISTRIBUTION

GUANGDONG NUCLEAR