NUCLEAR SAFETY: CHINA

MARHA TAM AND ALLAN LEE SAW XU JHATUN THIS MORNING. HE INFORMED

THEM :

1. CHINA WOULD GO AHEAD AS A MATTER OF NATIONAL ENERGY POLICY.

2. THERE WAS NO POWER STRUGGLE IN BEIJING.

3. THERE WAS A POSSIBILITY OF A SHORT DEFERRAL IN CONTRACT SIGNING TO ALLOW UMELCO STUDY GROUPS TO RETURN AND REPORT.

4. NCNA WOULD RECEIVE THE LOCAL SIGNATURE CAMPAIGN PETITION AT A

LOW LEVEL.

5. CHINA WAS MAKING PREPARATION TO EDUCATE THE PUBLIC.

HE SAID LOCAL ACTIVISTS WERE PREPARING A RALLY FOR SEPTEMBER 18- 918 ANNIVERSARY (DATE OF JAPANESE INVASION OF CHINA).

AKERS-JONES

GUANGDONG

LIMITED

HKD

FED

NED

TRED

PUSD(MR CROWLEY) WED

[COPIES SENT TO NO 10 DOWNING STREET]

P8

PS/MR RENTON PS/PUS

SIR W HARDING

MR DAUNT

MR WILSON MR SLATER

ADDITIONAL DISTRIBUTION

GUANGDONG NUCLEAR

CONFIDENTIAL

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.