THE UNOFFICIALS DID NOT HAVE ADEQUATE INFORMATION :

THE UNOFFICIALS SHOULD PREPARE FOR THE WORST H.E. THE

CHINESE WOULD PROCEED WITH THE PROJECT.

(KPM) WAH KU YAT PAO THE DISCUSSION WAS NOT VERY

N-DEPTH. NIT

WAS NOTED THAT MISS MARMIA TAM HAD REQUESTED THE SIGNING OF THE JOINT VENTURE CONTRACTS SHOULD BE DELAYED UNTIL THE UMELCO DELEGATIONS HAD RETURNED FROM US AND EUROPE. IT IS HOPED THAT THE

UMELCO WOULD MAKE PUBLIC THE FINDINGS OF THE DELEGATIONS.

K

(IN) EXPRESS IT WAS NATURAL TO EXPECT THE UMELCO MEMBERS TO HAVE DIFFERENT STANDS. THE DEBATE WAS BENEFICIAL AND CONSTRUCTIVE AND HELPED THE PUBLIC TO UNDERSTAND THE HOT ISSUE. IT WAS A PRC PROJECT AND CHINA SHOULD KNOW ABOUT THE PREVAILING FEELINGS IN HONG KONG.

AKERS-JONES

(REPEATED AS REQUESTED)

GUANGDONG

LIMITED

HKD

FED

NED

TRED

PUSD(MR CROWLEY) WED

[COPIES SENT TO NO 10 DOWNING STREET]

P8

PS/MR RENTON PS/PUS

SIR W HARDING

MR DAUNT

MR WILSON MR SLATER

-4-

ADDITIONAL DISTRIBUTION

GUANGDONG NUCLEAR