TNAG-1499-FCO40-2057-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 4

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

CONFIDENTIAL

5. GOURIEVIDIS ALSO TOLD ME THAT, AT THE SUGGGESTION OF THE NUCLEAN SAFETY ADMINISTRATION AND CHINESE NUCLEAR SOCIETY HE HIMSELF WOULD BE GIVING A PRESS CONFERENCE ON 17 JULY, APPARENTLY LARGELY TO LOCAL CHINESE AND A FEW HONG KONG JOURNALISTS (TO DE GATHERED TOGETHER BY THE NSA) EXPLAINING FRENCH DOMESTIC REGULATIONS FOR CONSTRUCTION AND OPERATION OF NUCLEAR STATIONS AND THE CO-OPERATION PLANNED

BETWEEN FRENCH AND CHINESE EXPERTS ON SAFETY.

CORRECTION

IN MY TELNO 1244 PARAGRAPH 3 REFERENCE TO TORONTO SHOULD READ 20

KMS NOT 230 KMS.

EVANS

GUANGDONG

LIMITED

HKD

FED

NED

TRED

PUSD(MR CROWLEY) WED

[COPIES SENT TO NO 10 DOWNING STREET]

P8

PS/MR RENTON PS/PUS

SIR W HARDING

MR DAUNT

MR WILSON MR SLATER

ADDITIONAL DISTRIBUTION

GUANGDONG NUCLEAR

CONFIDENTIAL

t

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.