FM FCOLN TO HOKON

021800Z JUL

GRS 600

Jakk 166/1

ныс

RECEIVED

4 JUL 1956

CONFIDENTIAL

بالا

CONFIDENTIAL

FM FCO

TO IMMEDIATE HONG KONG

TELNO 1303

OF 021800Z JULY 86

INFO IMMEDIATE PARIS

INFO ROUTINE PEKING, BTC HONG KONG, UKDEL IAEA VI

(1942)

(207

FCO TELNO 1276 TO HONG KONG AND PARIS TELNO 660 TO FCO:

GUANGDONG NUCLEAR SAFETY:

EXPERTS

PROPOSED VISIT TO CHINA BY UKAEA

47386

1.

AT A MEETING IN DEN ON 2 JULY, ATTENDED BY DTI, UKAEA AND AERE HARWELL, WE GAVE SOME PRELIMINARY THOUGHT TO THIS PROPOSED LIAISON VISIT (ASSUMING, OF COURSE, THAT THE FRENCH AGREE THAT WE SHOULD JOINTLY PROPOSE IT TO THE CHINESE, AND THAT THE CHINESE AGREE TO ACCEPT IT).

2.

DEN ARE NATURALLY CONCERNED THAT THE TEAM'S TERMS OF

REFERENCE SHOULD BE CAREFULLY WORKED OUT WELL IN ADVANCE, THAT THEIR REPORTING LINES SHOULD BE CLEAR (TO HKG UNDER THE CONSULTANCY AND TO HMG), AND THAT WE SHOULD AGREE ON HOW THEIR REPORT SHOULD BE HANDLED. DEN POINTED OUT THAT THE CONSULTANCY

ALREADY BEING CARRIED OUT BY UKAEA FOR HKG, LIKE OTHER CONSULTANCY WORK THEY UNDERTAKE, IS BASED ON CERTAIN ASSUMPTIONS ABOUT QUALITY CONTROL DURING THE CONSTRUCTION PHASE OF THE DAYA BAY REACTOR, AND ABOUT OPERATING STANDARDS ONCE THE STATION IS IN OPERATION. IF, PERHAPS AS A RESULT OF PRELIMINARY DISCUSSIONS

1

CONFIDENTIAL