TNAG-1499-FCO40-2057-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 205

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

MICK 166/

RECEIVED 11-

4 JUL 1986

CONFIDENTIAL

TOP COPY

215

Q

INDE

GRS 140

CONFIDENTIAL

FM HONG KONG

TO #MMED HATE FCO

TELNO 2095

OF 0307OOZ JULY 86

KINFO IMMED NATE PARMIS

INFO ROUTINE PEKING, BTC HONG KONG, UKMIS HAEA VIENNA

YOUR TELNO 1303

CHANA BY UKAEA.

215€

GUÁNGDONG NUCLEAR SAFETY : PROPOSED VISIT TO

THIS VIISHIT AND IN PARTICULAR THE TERMS OF REFERENCE SHOULD BE

ON THE AGENDA FOR YAXLEY'S VISHT NEXT WEEK.

2. WE HAVE NOTHING OF SUBSTANCE TO ADD IN ADVANCE OF FURTHER

DISCUSSIONS NEXT WEEK EXCEPT TO POINT OUT THAT WE HAVE ALWAYS

BELIEVED THAT UKAEA CANNOT COMPLETE THEIR RHISK ASSESSMENT (PHASE 2)

AND CONTINGENCY PLANNING ASSIGNMENTS TO OUR SATISFACTION UNTIL THEY

HAVE OBTAINED FULL DETAILS ABOUT ENGINEERING SAFETY FEATURES. #N

ADDITION INT SEEMS TO US THAT IT WOULD BE HIGHLY DESIRABLE FOR THEM

ALSO TO TAKE MINTO ACCOUNT QUALITY CONTROL DURING THE CONSTRUCTION

PHASE AND OPERATING STANDARDS ONCE THE STATION HIS OPERATING.

YOUDE

GUANGDONG

[COPIES SENT TO NO 10 DOWNING STREET]

LIMITED

HKD

FED

NED

TRED

PUSD(MR CROWLEY)

PS

PS/MR RENTON PS/PUS

SIR W HARDING

MR DAUNT

MR WILSON

ADDITIONAL DISTRIBUTION

GUANGDONG NUCLEAR

CONFIDENTIAL

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.