TNAG-1497-FCO40-2055-Guangdong-nuclear-power-station-project-at-Daya-Bay-safety-c-1986 — Page 278

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

ZCZC

MILNAN 1982 OCMIAN 1982

CONFIDENTIAL

DD 12010OZ HKBTC

FM INDUS TO HKBTC

111745Z MAR

GRS 1230

CONFIDENTIAL

leb m

34

CONFIDENTIAL

21982 - 1

LKK 166/1 RECEIVED IN REGISTRY 13 MAR 1986

FM DTI

TO DESKBY 120100Z BTC HONG KONG

DESK OFFICER

WDEX

PA

CISTRY

tion Taken

TELNO INDUS 52

OF 111745Z MARCH 86

AND TO DESKBY 120100Z PEKING

INFO PRIORITY PARIS

FROM ALTY

GUANGDONG NUCLEAR PROJECT: MIPT

QUOTE

1.

THE UK SIDE (HMG, GEC AND MIDLAND BANK) HAS REVIEWED IN

DETAIL THE POINTS SET OUT IN THE BOC/GNPJVC DOCUMENT OF 4 MARCH,

TAKING INTO ACCOUNT THE SUBSEQUENT MEETINGS BETWEEN THE CHINESE

AND UK SIDES IN SHENZHEN. THIS REVIEW HAS INCLUDED CONSIDERATION

BY DTI AND ECGD IN LONDON WITH THE INVOLVEMENT OF MR BENJAMIN AND

MR TWYFORD.

2.

THE UK SIDE REAFFIRMS, FIRST, THAT ITS EXISTING PROPOSALS (THE GEC/MIDLAND DOCUMENT OF 2 MARCH) ARE FULLY CONSISTENT WITH

THE TERMS OF THE MOU SIGNED BETWEEN HMG AND BANK OF CHINA: AND,

SECONDLY, AS MR BENJAMIN STATED LAST WEEK IN HIS MESSAGE TO MADAM HUANG, THAT ULTIMATELY ITS FLEXIBILITY IN MEETING THE CHINESE SIDE'S WISHES ON FINANCING IS LIMITED BY THE CONSTRAINTS

OF THE UK EXPORT CREDIT SYSTEM.

3.

HOWEVER, IN ORDER TO DEMONSTRATE ITS COMMITMENT TO EARLY

1

CONFIDENTIAL