Third Schedule.
(c)
any structure within Kowloon Walled City which
on the commencement of this order is identified
as a point on the Overlay Plan and Photograph
signed by the Clerk of Councils and deposited
in the Land Office and specified in the first
and second columns of the Third Schedule so
long as the height of any part of such structure
does not exceed the height above the principal
datum specified in relation thereto in the
third column of the Third Schedule.
Cancellation.
(Cap. 301 sub. leg.)
(Cap. 214 sub. leg.
5. The Hong Kong Airport (Control of Obstructions)
Order, the Hong Kong Airport (Control of Obstructions)
(Amendment) Order, the Hong Kong Airport (Control of
Obstructions) (No. 2) Order and the Metrication Amendments
(Hong Kong Airport (Control of Obstructions) Ordinance)
Order are cancelled.
1
FIRST SCHEDULE
EXEMPTED BUILDINGS
}
[para. 4(a).7
Item
Lot
1 *
Section T and Extension of Inland Lot 1705.
Height
The part of the building and approved building works rising from 85.34 m to 92.65 m as shown on plans approved by the Building Authority on 2nd February 1963, 2nd March 1965, 20th February 1967, 17th April 1968, 12th October 1971, 23rd May 1972 and 20th August 1973 under Buildings Ordinance Office reference number 2/3075/62.