WORK PROGRAMME

1

2

3

A

5

Establish

STAGE/TASK

Operational Financial Feasibility

1.

Demand/Revenue Projection

Cost Breakdown

2.

Review Cost Data*

༢.

Financial Evaluation of Project

4. Sensitivity Analysis

Optimum Financing Plan and Equity Structure

2

5.

Analysis of Capital Construction Cost

3

6.

Analysis of Funding Sources

7.

Preliminary Financing Models

8.

Currency and Monetary Implications.

9. Structure Operating Body

10. Final Evaluation

Reports

7

ATTACH NT A

MONTH

6

7

18

9

10

4

8

14

15

(0

10

-5~

11

12

13

16

17

D

11. Final Report

Meetings

PM1

PM2

PM3

IR

PM4

PM5 PM6 FR

* Client has indicated that preliminary cost data will be available in May 1982

We would begin this task earlier if the data becomes available.

D = draft

F = final

- 17

F

123

PM = progress meeting

IR

***

FR =

interim review meeting

final review meeting

subject of meeting numbered as detailed in Attachment