TNAG-1062-FCO40-1312-Replacement-airport-for-Hong-Kong-1981 — Page 48

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

N16.000

17.000

18.000

20.000

19.000

1-112

A-113 1414

PHASE la

PHASE lb

---PHASE II-

RECLAMATION SEQUENCE

DREDGE ALL MARINE SEDIMENTS AND PLACE FILL WITHOUT DELAY.

DREDGE TO LEAVE 3 METERS OF MARINE SEDIMENTS PLACE BEDDING COURSE ANO FILL.

3) PLACE FILL MATERIAL

PLACE FILL MATERIAL

DREDGE ALL MARINE SEDIMENTS AND

PLACE FILL WITHOUT DELAY.

DREDGE TO LEAVE 5 METERS OF MARINE SEDIMENTS. PLACE BEDDING COURSE AND FILL.

PLACE FILL MATERIAL

1/3.

SHALO WAN

-17.

1-18

AM CHAU

НАШНОК

WAN

ཡ།༽

*TIN SAM

12

PO

SAN

TUNG CHUNG BÀY

100

AN CHUNG

WONG NAI UK

MA WAN

SHA TSUI TAU

Figure 16 - Proposed Construction Zones and Reclamation Sequence