J Butterworth Esq HM Treasury

they have contacted us, but they tell me that they cannot get anywhere near a real estimate of the likely price, and will not be able to do so until they have put together their detailed tender. I have seen estimates of £30m for each of the 11 major tunnelling contracts, but this figure also must be treated with caution at this stage. The total value of the tunnelling contracts could be £330m which with the £80m for Taylor Woodrow gives an overall figure of £410m. Assuming that the UK element of these contracts might be as high as 50% - 75% then we face a possible maximum ECGD commitment of £200m £300m for the UK element and a further £30m - £45m if we provided support for local costs up to 15% of the UK element.

W

Electrical and Mechanical Equipment

6. MTRC propose to split the E & M work into eighteen separate contracts:-

(a) Rolling Stock

MetCam will definitely bid, and have told us that MTRC have a firm requirement for between 100 and 150 unpowered cars worth about US$100m.

(b) Signalling System; Cable and Pipe Brackets

Westinghouse will bid for the two contracts worth about £15m in total.

(c) Other equipment contracts

GEC will bid for the power supply contract worth about £20m. An application from Balfour Beatty for contracts worth about £5m is also expected.

Consultancy Services

7. Lazards have made an application at MTRC's request for a line of credit for HK$100m principally for consultancy contracts which they say could range in value from £3m each for two or three contracts relating to tunnelling work down to about £1m. They have also asked that the line should be available to sweep up a number

of small hardware contracts.

Total Prospective ECGD Exposure

8.

A possible maximum loan value of £400m might arise:-

Construction contracts

Rolling Stock

Other E & M

Consultancy contracts

£300m

}

£ 50m

>

£400m

£ 40m

>

£ 10m)

In practice it seems highly improbable that more than half this amount will be won by UK tenderers. Assuming a loan value of £200m ECGD's liability would be about £300m spread over the next 12/13 years.

Terms Sought by MTRC

9. MTRC's prospectus contains the following:

1114. Currency of Payment

The required currency of payment for all contracts is Hong Kong dollars.

2.

ghe

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.