FEASIBI

STUDY REPORT ON JOINT NUCLEAR

POWER DEVELOPMENT

SYNOPSIS

1.

2.

INTRODUCTION

This joint feasib Power Company over the last 1:

power station of accommodated in integrated into without resulting and performance.

The total base at US$1857.5 mi? the 2 x 900 MW and 1989 respec charges, price US$4068 million been established of US$4086 milli

(90%), all loans economic evaluat

station in Guan

lower than that a reasonable prof

SYSTEM DESIGN

The maximum

accommodated by t is identified t: capacity which co 2 x 900 MWe. Re

the 2 x 900 MWe n

Hong Kong system also satisfactory the Guangxi syster

The nuclear POWE networks by one and one 400 respectively. 400 kV (construc Liantang Substati.. which would in t

500 kV overhead overhead line cize

After commissionir Hong Kong system:

and maintain the

station. Each 57 automatic contro

the interconnecte

7 study which has been carried out by Guangdong and China Light & Power Company Limited (CLP)

ths has come to the conclusion that a nuclear oximatly 2 x 900 MWe capacity can be safely Shan or Tun Yang, Shenzhen, and can be interconnected Guangdong and Hong Kong systems any unacceptable drawback in system operation

the nuclear power station has been estimated at 1980 prices. Basing on the assumption that will be put into commercial operation in 1988 and taking into account the initial fuel tion, interest etc., the total cost will be $2369 million at present value. It has also assuming the estimated total capital investment be financed by equity share (10%) and loans be repaid within 15 years. The results of lso demonstrate that the joint nuclear power can produce and sell electricity at a price

· coal-fired plant in Hong Kong and yet maintain vel.

generating unit capacity which can be sabined Guangdong/Hong Kong power system in 1988 900 MWe. The maximum nuclear power station accommodated by the combined system in 1989 is lity analysis shows that after commissioning of or units, the generating capacity reserve of the atisfactory and that of the Guangdong system is adequate measures such as interconnection with

taken.

ation would be connected to the GPC and CLP V overhead line circuit to Dongjiao Substation erhead line circuit to Tai Po Substation zer station would further be connected by one to 500 kV design) overhead line circuit to > new substation to be established in Shenzhen, ve connected to the GPC and CLP networks by one circuit to Dongjiao Substation and one 400 kV to Yuen Long Substation respectively.

the nuclear power station, the Guangdong and fuld, in principle, be independently despatched reed share of output from the nuclear power would adopt adequate operational procedures and :lities to effect safe and secure operation of

tem.