TNAG-0936-FCO40-1155-Visit-of-Norman-Fowler--Minister-of-Transport--to-Hong-Kong--1980 — Page 106

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

ਆਮ ਆ

TSUEN MAN EXEGION

LODINIMD ́IIIAL SYSTEM

Opimtion

Frequency of trains

Schedul.d spccd

Maximum speed

Avorge sttion stopsing

tima in pek hours

Hours of operation

2 minuts in punk hours

33 km/h. (20mph) (i cluding station stops)

80km/h. (50 mph)

30 secon/is

As for HIS

Journey times

Passung. I volume

intenance Depot

Administr tion Officus and Control

Traction voltero

Op.m. to 1 a.m. approximately when fully operational (19 hours drily)

Kun Tong to Chat r: 28 minutes Kwun Tong to Tsim Sha Tsui :

23 minutes

A out one million a day in the mid-1960's

Sto ed fare systtom, with 21 minimun rising to IX 3.00

Kowloon Bay

Kowloon Bay

500

1,500 v. D.C.

Tsuen Wan to Chatur 29.5 minutis Tsuen Ven to Tsim Sha Tsui : 24.5 minu Tsuen Wan to Kwun Tong (chon e t Frince Edw.re) : 35. minutes

Combin d railway will carry about 1.8 million in mid 198

Tsuen en

Kowloon Bay

1,500 v. D.C.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.