HONG KONG: MASS TRANSIT RAILWAY: CLEARANCE OF BUILDINGS

AT SAI LAU KOK

Problem

1. At their request Mr Blaker saw 4 Labour MPs about this

clearance on 26 July. He undertook to write to them about

some of the points they raised.

Recommendation

2. I recommend that Mr Blaker write on the lines of the

attached draft.

99

A

as

SOA

86

Background

3.

4.

The history of the clearance is summarised in the background

note attached to my submission of 25 July. FCO telegram No 595

to Hong Kong contains a summary of the points made by the MPs.

The situation on 1 August is described in Hong Kong

telegram No 1090. The details of the compensation and allowances

payable to those affected are in Hong Kong telegram No 1078.

Revangen

8 August 1979

RJT McLaren

Hong Kong and General Department