TNAG-0770-FCO40-974-Construction-of-underground-railway-system-in-Hong-Kong-1978 — Page 97

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

CONTENTS

SUMMARY

Chapter 1

BACKGROUND

Arrangement of Report

The Objectives of the Island Corridor Study The Study Approach

Existing and Future Problems in the Corridor The Alternative Systems Evaluated Evaluation of the Alternative Systems

PAGE

1

234472

12

Chapter 2

DEVELOPMENT OF EVALUATION RESULTS

Introduction

20

System Configuration

20

Central Area Tunnels

26

Light Rail Vehicles and Trams Bus Operations

27

29

Chapter 3

ADDITIONAL FACTORS CONSIDERED IN THE FORMULATION OF THE RECOMMENDED STRATEGY

Introduction

31

Evaluation Criteria

32

Risk and Uncertainty

34

Relationship to Committed Transport Schemes Conclusions

37

38

Chapter 4

THE RECOMMENDED PUBLIC TRANSPORT STRATEGY FOR THE ISLAND CORRIDOR

The Principal Features of the Strategy The Principal Advantages of the Strategy The Principal Disadvantages of the Strategy

40

44

46

Chapter 5

IMPLEMENTING THE RECOMMENDED STRATEGY

Introduction

Upgrading the Tramway to Light Rail Transit Implementation of LRT in 1981

Second Stage Development of Light Rail Transit Development of the Bus System

Public Light Buses

Further Development of the Light Rail Transit

system

Proposed Programme

Review of Necessary Action

22 2894nRR

56

57

68

70

73

73

APPENDIX A

Planning Specification of Proposed

Light Rail Vehicle

78