TABLE 4
ESTIMATED CAPITAL COSTS:
STAGES 1 AND 2
LRT SYSTEM
CAPITAL COST ( 3 million )
Year
INFASTRUCTURE etc
VEHICLES
LAND
TOTAL
1979
43.0
34.8
77.8
1980
123.9
267.8
391.7
1981
207.1
93.9
301.0
1982
267.4
267.4
1983
147.3
47.3
194.6
TOTAL 1978-1983
788.7
315.1
128.7
1232.5
1986
6.4
6.4
1987
6.4
53.6
60.0
1991
8.0
8.0
1992
8.0
66.6
74.6
1998
8.3
8.3
TOTAL 1973-1996
825.8
435.6
128.7
1389.8
*Capital cost is expressed in 1977 prices. Figures include allowances
for contingencies, overheads. Land costs are expressed in "financial" terms i.e. cost to the operator. Costs for schemes necessitated
by the LRT system such as flyovers etc are included.