CONFIDENTIAL
COAL MINING AND ANCILLARY EQUIPMENT
(A) A COMPREHENSIVE RANGE OF CUTTING AND CONVEYING SYSTEMS (INCLUD ING RANGING DRUM SHEARERS, ARMOURED FACE CONVEYORS AND CHAINLESS HAULAGE SYSTEMS): SELF-ADVANCING POWERED ROOF SUPPORTS AND ASSOCIATED CONTROL EQUIPMENT INCLUDING SHIELD SUPPORTS: TUNNELLING MACHINES (INCLUDING ROAD HEADERS, IMPACTORS, AND FULL FACE TUNNELLING MACHINES: TRANSPORT SYSTEM FOR MEN AND MATERIALS:
KINE MONITORING AND CONTROL EQUIPMENT: DUST SUPPRESSION, VENTILATION AND PUMPING EQUIPMENT: FLAMEPROOF AND INTRINSICALLY SAFE UNDERGROUND ELECTRICAL EQUIPMENT: MINE LIGHTING SYSTEM: DRILLING EQUIPMENT: WINDING GEAR, HEADFRAMES AND SHAFT EQUIPMENT: COMPLETE COAL PREPARATION PLANT, ASSOCIATED VEHICLES AND SUPPORT SERVICES:
(3) LONG DISTANCE OVERLAND CONVEYOR SYSTEMS (EG CHAIN BELT, SLURRY PIPELINE AND AIRIAL ROPEWAY): BOOM STACKERS: BUCKET WHEEL RECLAIMERS: ALL TYPES AND CAPACITY OF CRANES: AND
(C) SPECIALISE ALL-STEEL COAL RAILWAY TRUCKS, INCLUDING BOTTOM DUMPING HOPPERS AND SIDE DUMPING AND ROTARY TIPPLER VEHICLES IN A VARIETY OF SIZES FROM 32 TONS CAPACITY (GROSS LADEN WEIGHT 46 TONS) TO 80 TONS CAPACITY (GROSS LADEN WEIGHT 100 TONS).
11
POWER STATIONS AND GENERATING EQUIPMENT
(A) COMPLETE COAL OR OIL FIRED POWER STATIONS:
(B) OVERALL STATION AND MECHANICAL DESIGN, CIVIL WORKS DESIGN: CIVIL CONSTRUCTION: MECHANICAL ERECTION: SUPPORT SERVICES, INCLUDING ASSISTANCE WITH THE TRAINING AND DEVELOPMENT OF STAFF: AND (c) POWER GENERATION EQUIPMENT INCLUDING STEAM RAISING PLANT: WATER TUBE BOILERS AND HEAT RECOVERY SYSTEMS: OIL, COAL AND GAS FIRING SYSTEMS: STEAM TURBINE GENERATORS AND ASSOCIATED STEAM CONDENSERS, FEED-HEATING AND ANCILLARY PLANT, TURBO-TYPE AND OTHER GENERATORS: ALTERNATIVE PRIME MOVERS (EG HEAVY DUTY AND AIRO-DERIVED GAS TURBINES UP TO 100 M W AND DIESEL ENGINES) AND CONTROL EQUIPMENT. TO FACILITATE PURCHASES. IN THESE CATEGORIES, H M G WILL BE PRE- PARED TO MAKE AVAILABLE APPROPRIATE EXPERTS FROM U K NATIONALISED INDUSTRIES IN PARTICULAR, THE NATIONAL COAL BOARD AND CENTRAL ELECTRICITY GENERATING BOARD TO CO-OPERATE WITH THE CHINESE AUTHOR- ITIES IN INITIAL ASSESSMENTS OF SPECIFIC PROJECTS. IN ADDITION, SIR DEREK EZRA, THE CHAIRMAN OF THE NATIONAL COAL BOARD WILL BE ACCOMPANYING MR DELL TO PEKING IN AUGUST AND WILL BE AVAILABLE TO DISCUSS CHINESE REQUIREMENTS FOR COAL MINING AND ANCILLARY EQUIP- MENT: AND H M G HAS OFFERED TO SEND A POWER PLANT MISSION COMPRISING
Zi
CONFIDENTIAL
/SENIOR
No comments yet.
Private notes are available after approval.