SUBSTATIONS
DD.
1. ALL 400KV SWITCHGEAR, I.E FIFTEEN BAYS INCLUDING TWENTY-
SIX CIRCUIT BREAKERS, TWO SWITCH ISOLATORS AND ALL 400KV SF6 CONNECTIONS AND PROTECTION AND CONTROL.
2. TRANSFORMERS AND REACTORS
A. TWELVE X 240 MVA
B. TWO
X 180 MVA
C. TWO. X 100 MVAR
3. AUXILIARY SERVICES, IDENTIFYING CONTENT.
4. CIVIL DESIGN,
5. PROVISIONAL SUMS, IDENTIFYING CONTENT.
SPARES.
EE. PROJECTS MANAGEMENT AND ENGINEERING DESIGN.
FF.
GG.
CONSULTANCY SERVICE.
ELECTRIFICATION TO KWANTUNG PROVINCE.
HH.
OTHERS TO BE IDENTIFIED.
FOR EACH OF THE ABOVE WE REQUIRE FOLLOWING BREAK-DOWN :-
EQUIPMENT OR SERVICE COST (FOB OR LOCAL)
ERECTION COST
11
JJ
KK
FREIGHT (OCEAN PLUS LOCAL)
LL
INSURANCE
MM
TOTAL.
E SUM
THE SUM OF ALL TOTALS SHOULD EQUATE TO ITEM 4.1 OF VOLUME 1.
BARRETT
LIGHTPOWER
ENDS
MARCH