SCHEDULE

را

Reference No: BC (FC) 455 93000

1.

SUPPLIER:

2.

BUYER/BORROWER :

3.

GUARANTOR:

GEC Turbine Generators Ltd

Kowloon Electricity Supply Company Ltd (KESCO) or sister company

none

DESCRIPTION OF PROJECT:

Design, project management and supply of all major mechanical and electrical plant for Units 3 and 4

5.

DETAILS OF UK CONTRACTUAL RESPONSIBILITY:

A

UK element

Alternative A* Value (£s)

Alternative B* Value (£s)

i.

Units 3 and 4

76,198,500

75,661,500

ii.

Provisional sums (including CPA)

45,899,000

42,363,000

iii. Freight and insurance

charges

6,660,000

6,480,000

£128,757,500

£124,504,500

*Variation between A and B depends upon commissioning dates

6.

TERMS OF PAYMENT TO SUPPLIER:

From Loan %

From Buyer Direct %

UK and local element (if any)

85

15

(In addition borrower to have right to draw finance for locals up

to the level of direct payments less any drawings GEC may make for locals. N.B. GEC's own drawings are likely to be minimal.)

7.

MAXIMUM AMOUNT OF LOAN:

a UK element

b Local element

Total amount to be guaranteed

(to which interest must be added)

6

Alternative A

Value (s)

Alternative B

Value (£s)

109,443,875

105,828,825

19,313,625

18,675,675

£128,757,500

£124,504,500

to include drawings made direct by the Borrower