Dates. Based on their Study results, the Ship Department
that if the NSR for the replacement
3[(1)].
confirmed in later discussions (1
Craft was endorsed and issued by March/April 1979, the following procurement programme should be achievable:
(1) August 1979
financial approval to order long lead items.
(2) September 1979
(3) November 1979
tendering documents ready.
invite tenders.
(4) February 1980
-
receive tender replies.
(5) May 1980
(6) August 1982
· place order.
accept ship 01.
(7) December 1983
acceptances 01-05 complete.
NOTE:
Ship Department stated a preference to have the first ship built in
UK. However, it was felt follow-on ships could be built in Hong Kong but
that this might cause some delay to the above acceptance dates.
h. Study Report Conclusions.
concluded
The Ship Department Study
that there appeared to be no available craft which fully
satisfied the spirit and letter of the NST and its supporting paper.
It was felt the intentions of the NST would be best accomplished by
conducting a 'design and build' tender competition based on a force
of five 45-50 metre craft, of fairly high freeboard and a maximum
speed of 25 knots. The tender should include an enquiry into building
in Hong Kong.
The timescale quoted in para 3g above is based on this type of
tendering action.
[(1)
DNOR 22617/2/2 dated 26 Jul 78 - Minutes para 5.
5.3