d.
(For the Civil Secretary). If the route is accepted and the boundaries unaltered should an indemnity be sought from China Light and Power Co?
What limitations would need to be imposed on range use during construction of the cable and subsequent maintenance periods?
The team's report on this issue should also be submitted to CBF.
6. It was agreed that AT1c would take the lead on arranging the visit, which should take place in 3 to 4 weeks time. By this time it could be expected that the resurvey of the cable route would have been completed.
17 May 78
Nichola
for Pret
N M PREST DS6a
MB Ext 7359
Distribution:
Those present plus AUS (GS)
Head of GF3
DAQ
FCO Hong Kong Dept
RESTRICTED
-3-