Transport to 1985
9.
a)
b)
c)
Complete the circular motorway linking
Shatin with Taipo, Yuen Long, Tuen Mun,
Tsuen Wan and back to Shatin.
In the urban area build or complete
urban motorways, ie Kwun Tong Road, the
East Island Corridor, the East and West
Kowloon Corridors, together with the
Aberdeen, Kai Tak and Lion Rock road
tunnels. Introduce traffic management
measures, including computerised area
traffic control schemes.
Investigate the possibility of an additional
fixed harbour road crossing.
d)
Open the
e)
Modified Initial System of the Mass
Transit Railway in two stages in late 1979 and April
1980 and the Tsuen Wan Extension towards the end
of 1982.
Complete double-tracking and electrification of
the Kowloon Canton Railway by the end of 1981.
Link KCR to the MTR at a new Kowloon Tong interchange
station by 1982.
f)
Possibly replace the trams along the North Shore
of Hong Kong island by 1981 with a mass transit
light rail system which by 1983 would run underground
through the Central District and interchange with
two MTR stations.
CONFIDENTIAL
No comments yet.
Private notes are available after approval.