TNAG-0637-FCO40-785-Supplies-of-electricity-for-Hong-Kong-1977 — Page 131

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

TRANSMISSION PACKADE

ERECTION PACKAGE

LOCAL SUPPLIERS

QUALITY ASSURANCE

COMMISSIONING

EHV SWITCHGEAR, TERMINATIONS LINES PROTECTION

S

METHOD OFF LOADING, STORAGE

SI TE PRESERVATION IN STORE

PREFERENCES

N

WORKS INSPECTION SITE INSPECT-

+

ION CHEMISTRY

NDT SERVICES

TAKING OVER PROCEDURES

STAFF TRAINING

OPERATION AND MAINTENANCE

BUYING PROCEDURES

APPRAISAL AND RECOMMENDATIONS

4. CIVIL WORKS

SITE INVESTIGATIONS

FOUNDATION DESIGN

ARCHITECTURE

CIATION WITH CIVIL CONSULTANTS

SUPERVISION OF WORKS

5. CLP/CD+C RELATIONSHIP

ASSISTANCE TO CLP - LOCAL IN UK

DOCUMENTATION

VARIATIONS AND AUTHORITIES

REPORT ON GROUND CONDITIONS

ECONOMICS IN FOUNDATIONS CUT AND FILL BALANCE GROUND AND CW

SYSTEM LEVELS

AMENITY ENVIRONMENTAL DESIGN OFFICES, STORE, ABLUTIONS STANDARD OF FINISHES CHIMNEY UK/LGEACHTSEFERENCES

MAIN PLANT DESIGN AUXILIARY PLANT DESIGN SYSTEM DESIGN PROGRAMME PREPARATION PROGRESS MONITORING AND REPORTING

FINANCIAL CONTROL ESTIMATES, BUDGET AUTHORISATIONS VARIATIOS

5. IF THE UK PACKAGE PROVES UNACCEPTABLE TO CLP/PEFCO, AND