TRANSMISSION PACKADE
ERECTION PACKAGE
LOCAL SUPPLIERS
QUALITY ASSURANCE
COMMISSIONING
EHV SWITCHGEAR, TERMINATIONS LINES PROTECTION
S
METHOD OFF LOADING, STORAGE
SI TE PRESERVATION IN STORE
PREFERENCES
N
WORKS INSPECTION SITE INSPECT-
+
ION CHEMISTRY
NDT SERVICES
TAKING OVER PROCEDURES
STAFF TRAINING
OPERATION AND MAINTENANCE
BUYING PROCEDURES
APPRAISAL AND RECOMMENDATIONS
4. CIVIL WORKS
SITE INVESTIGATIONS
FOUNDATION DESIGN
ARCHITECTURE
CIATION WITH CIVIL CONSULTANTS
SUPERVISION OF WORKS
5. CLP/CD+C RELATIONSHIP
ASSISTANCE TO CLP - LOCAL IN UK
DOCUMENTATION
VARIATIONS AND AUTHORITIES
REPORT ON GROUND CONDITIONS
ECONOMICS IN FOUNDATIONS CUT AND FILL BALANCE GROUND AND CW
SYSTEM LEVELS
AMENITY ENVIRONMENTAL DESIGN OFFICES, STORE, ABLUTIONS STANDARD OF FINISHES CHIMNEY UK/LGEACHTSEFERENCES
MAIN PLANT DESIGN AUXILIARY PLANT DESIGN SYSTEM DESIGN PROGRAMME PREPARATION PROGRESS MONITORING AND REPORTING
FINANCIAL CONTROL ESTIMATES, BUDGET AUTHORISATIONS VARIATIOS
5. IF THE UK PACKAGE PROVES UNACCEPTABLE TO CLP/PEFCO, AND