TNAG-0637-FCO40-785-Supplies-of-electricity-for-Hong-Kong-1977 — Page 129

FCO40 Hong Kong Department Records 聯邦事務部香港部檔案 All

1.

SITE LOCATION

STATION PARTICULARS AND REUIREMENTS

STATUTORY REQUIREMENTS

ACCESS

OPERATION

FOR CONSTRUCT) ON FOR

TOPOGRAPHY

FUELS COAL/OÏL

FUEL HANDLING

ASH DISPOSAL

CV SYSTEM

BOÏLER FEED MAKE-UP

TRANSMISSION

FOUNDATIONS

LOAD FACTOR

TWO SHIFT

COLD START

NOISE SECURITY

DUST:S:JOKE:EFFLUENTS: APPEARANCE

AIRCRAFT OBSTRUCTION

ROAD SEA, JETTIES, HARBOURS RIGHTS OF WAY LAND OWNERSHIP

SITE SURVEY SEISMIC ASPECTS

FLOOD LEVELS AND TIDES MET.DATA/HURRICANES CUT AND

FILL BALANCE

RANGE AND CHARACTERIESTICS

SHIP TONNAGE OFFLOADING,

JETTY REQUIREMENTS STORAGE AND

PRECAUTIONS

AREAS AND LOCATIONS PREFERRED

MATERIALS TERMINAL POINTS.

REQUIREMENTS/TEMPERATURE/ QUANTITIES TIDAL REQUIREMENTS SILT BURDEN/ACRESSION INTAKE

AND OUTFALL LOCATIONS SURVEY

REQUIREMENTS TERMINAL POINTS

ANALYSES/CHARACTERISTICS

QUANTITIC PERFORMANCES

TERMINAL LOCATION AND DIRECTION

OF LINES

SUBSOIL CONDITIONS AND

CHARACTERISTICS PRELIMINARY INFORMATION SEISMIC ASPECTS

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.