PART I

SECRET

APPENDIX "C"

2.

3.

Acquisition of land

(A) For the construction sites along the route

alignment.

(B) For work, storage and other necessary sites.

Agreements with, and payment of compensation to, residents and landowners along the route alignment.

Acquisition of rights of way and access and enforcement of traffic control.

4. Timely provision of below listed data :

5.

6.

7.

PART II

1.

(A) Information on soil conditions.

(B) Details of underground utilities and building

foundations along the route alignment.

(c) Special conditions for each work site, covering

such things as traffic, noise limitations, safety requirements, etc.

Provision and arrangement of the below listed sites and materials before the commencement of construction works.

(A) Quarry for aggregate.

(B) Dumping area for the excavated soil.

(C) Borrow-area of backfilling soil for the

excavated sites.

Site formation of Kowloon Bay Depot.

All the site formation works and associated civil works (such as clearing and grabbing, earth work, construction of drainage ditches, concrete pavement, and re-construction of existing channels) in Kowloon Bay Depot shall be completed by local contractors hired by the Government before the commencement of construction works.

Sea wall for the proposed fabrication yard for the immersed tube at Chai Wan to be completed by the Government before the commencement of construction works.

Arrangements for housing expatriate workers.

2. Arrangements for provision of electric power and water.

3.

Arrangements for adequate wharfage and lighterage for delivery of equipment and materials.