SECRET
XCS(73)12
V (c) (Grace period)
(Repayment
V (d)
period)
V(g)
(Guarantee)
VII(a)(i)` (Construction period)
15
- 6.·
All three consortia meet this requirement, but the Japanese Consortium have offered a period of grace after the completion of construction one year longer than the other two consortia.
!
Within the Anglo-Italian Group, only the British element is able to meet this requirement; the Italian element can only offer a repayment period of nine years.
CH
Whereas the other two consortia have definitely stated that they do not require a Government guarantee, the Japanese Consortium are still insisting on this. They have stated, however, that the guarantee would not result in a specific charge being created on the Colony's assets. It would only be a general guarantee of the repayment of the debt.
The Anglo-Italian Group envisage a construction period of six years, whilst the other two consortia have under- taken to meet the requirement for a five year construc- tion period.
As regards pricing, only the Japanese Consortium in their pre-emptive bid meet all the requirements in Section III of Annex E.
16
The Anglo-Italian Group have submitted a ceiling price which is at least $1,000 million above the Government's required ceiling price of $5,000 million. Their ceiling price is based on a maximum contract price, plus an assumed rate of cost escalation of 10% per annum. However, they claim that, by early next year, they should be able to quote a lower contract price which, after taking into account the assumed rate of cost escalation of 10% per annum, would produce a lower ceiling price. On this basis, their lowest ceiling price would be about $5, 200 million, The actual price paid would be lower than this figure if the average rate of cost escalation over the construction period turned out to be lower than 10% per annum. On the other hand, the Group insist that any cost escalation above 10% per annum should be considered as "force majeure" and be charged to the client's account. It follows that, given the most favourable assumptions, i, e. a contract price at or close to their lowest estimate and a rate of cost escalation below 10% per annum (say, the 8% assumed in the calculations in memorandum XCS(73)8), the Group might be able to complete the project at a cost at or below $5,000 million. However, on more unfavourable assumptions as regards the initial contract price and/or the actual rate of cost escalation, the final price could be much more than $5,000 million. (As the Group's two alternatives explained in paragraph 12 above virtually amount to the same thing, the foregoing analysis refers to Alternative 1 only).
SECRET
No comments yet.
Private notes are available after approval.